
Description
Engineering project at SolarTurbines focused on redesigning the Titan 250 Inter-Stage Duct to lower costs and improve manufacturability.
- Optimized material selection using thermal and structural simulations in ANSYS FEA.
- Eliminated seal strips by redesigning as a non-segmented ring, reducing machining costs.
- Improved test cell efficiency through process optimization.