Interstage Duct Redesign

Aerospace
Mechanical Design
Interstage Duct Redesign

Description

Engineering project at SolarTurbines focused on redesigning the Titan 250 Inter-Stage Duct to lower costs and improve manufacturability.

  • Optimized material selection using thermal and structural simulations in ANSYS FEA.
  • Eliminated seal strips by redesigning as a non-segmented ring, reducing machining costs.
  • Improved test cell efficiency through process optimization.